Bedrock determined the excavation depth and is down about 8' on the east side of the hole and 5' on the west side. Rather than breaking the rock, we decided to use our substantial amount of excavated dirt to build up around the tanks - basically extending the hillside out to cover them.
Description | Cost |
Labor (4 days) | $3200 |
Equipment (4 days) | $3394 |
Total | $6594 |